Home / Products / Vishay Siliconix / SUD35N10-26P-GE3

Vishay Siliconix SUD35N10-26P-GE3

MOSFET N-CH 100V 35A TO252

Answer first: this page is a purchasing reference for the exact part number SUD35N10-26P-GE3 from Vishay Siliconix. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Vishay Siliconix Part number: SUD35N10-26P-GE3 Package: TO-252-3, DPAK (2 Leads + Tab), SC-63 RFQ verification required

Key Parameters

Part NumberSUD35N10-26P-GE3
ManufacturerVishay Siliconix
CategoryFETs, MOSFETs
packageTO-252-3, DPAK (2 Leads + Tab), SC-63
seriesTrenchFET®
packagingTape & Reel (TR)
product statusActive
param 1N-Channel
param 2MOSFET (Metal Oxide)
param 3100 V
param 435A (Tc)
param 57V, 10V
param 626mOhm @ 12A, 10V
param 74.4V @ 250µA
param 847 nC @ 10 V
param 9±20V
param 102000 pF @ 12 V
param 11-
param 128.3W (Ta), 83W (Tc)
param 13-55°C ~ 175°C (TJ)
param 14-
param 15-
param 16Surface Mount
param 17TO-252AA

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify SUD35N10-26P-GE3 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For SUD35N10-26P-GE3, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.