WAGO Corporation 2006-1671/1000-851
GROUND CONDUCTOR DISCONNECT TERM
Answer first: this page is a purchasing reference for the exact part number 2006-1671/1000-851 from WAGO Corporation. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | 2006-1671/1000-851 |
|---|---|
| Manufacturer | WAGO Corporation |
| Category | Din Rail, Channel |
| series | TOPJOB®S |
| packaging | Box |
| product status | Active |
| param 1 | Disconnect |
| param 2 | Switch, Knife |
| param 3 | 2 |
| param 4 | 1 |
| param 5 | 15.0mm |
| param 6 | Push In, Spring |
| param 7 | - |
| param 8 | 230V |
| param 9 | 30 A |
| param 10 | 230V |
| param 11 | 8-20 AWG |
| param 12 | 0.5-10mm² |
| param 13 | LED, Resistor |
| param 14 | Gray |
| param 15 | - |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify 2006-1671/1000-851 Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For 2006-1671/1000-851, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.