Home / Products / Film Capacitors / WIMA / SMDIC03470QB00KP00

WIMA SMDIC03470QB00KP00

CAP FILM 0.47UF 10% 63VDC 2220

Answer first: this page is a purchasing reference for the exact part number SMDIC03470QB00KP00 from WIMA. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: WIMA Category: Film Capacitors Part number: SMDIC03470QB00KP00 Package: 2220 (5750 Metric) RFQ verification required

Key Parameters

Part NumberSMDIC03470QB00KP00
ManufacturerWIMA
CategoryFilm Capacitors
package2220 (5750 Metric)
series-
packagingTape & Reel (TR)
product statusActive
param 10.47 µF
param 2±10%
param 340V
param 463V
param 5Polyphenylene Sulfide (PPS), Metallized
param 6-
param 7-55°C ~ 140°C
param 8Surface Mount
param 90.224" L x 0.201" W (5.70mm x 5.10mm)
param 100.189" (4.80mm)
param 11Solder Pads
param 12-
param 13General Purpose
param 14-
param 15-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify SMDIC03470QB00KP00 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For SMDIC03470QB00KP00, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.