Home / Products / Specialized / 3M / MP2-S030-51M1-C-TG30

3M MP2-S030-51M1-C-TG30

CONN RCPT FUTUREBUS+ 30P EDGE MT

Answer first: this page is a purchasing reference for the exact part number MP2-S030-51M1-C-TG30 from 3M. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: 3M Category: Specialized Part number: MP2-S030-51M1-C-TG30 Package: RFQ verification required

Key Parameters

Part NumberMP2-S030-51M1-C-TG30
Manufacturer3M
CategorySpecialized
seriesMetPakā„¢ MP2
packagingTube
product statusObsolete
param 1Backplane
param 2Receptacle, Female Sockets
param 3Futurebus+®
param 430
param 5All
param 60.079" (2.00mm)
param 75
param 8-
param 9Board Edge, Through Hole, Right Angle
param 10Solder
param 11-
param 12Board Guide, Board Lock, Spacer
param 13Gold
param 1430.0µin (0.76µm)
param 15Beige

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify MP2-S030-51M1-C-TG30 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For MP2-S030-51M1-C-TG30, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.