Home / Products / Edgeboard Connectors / 3M / SPD08-050-RB-TR

3M SPD08-050-RB-TR

CONN EDGE DUAL FMALE 50POS 0.031

Answer first: this page is a purchasing reference for the exact part number SPD08-050-RB-TR from 3M. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: 3M Category: Edgeboard Connectors Part number: SPD08-050-RB-TR Package: RFQ verification required

Key Parameters

Part NumberSPD08-050-RB-TR
Manufacturer3M
CategoryEdgeboard Connectors
seriesSPD08
packagingTape & Reel (TR)
product statusActive
param 1Non Specified - Dual Edge
param 2Female
param 3-
param 450
param 50.062" (1.57mm)
param 62
param 70.031" (0.80mm)
param 8Dual
param 9Board Guide
param 10Surface Mount
param 11Solder
param 12Copper Alloy
param 13Gold
param 1430.0µin (0.76µm)
param 15Cantilever
param 16Black
param 17-
param 18-55°C ~ 125°C

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify SPD08-050-RB-TR Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For SPD08-050-RB-TR, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.