Home / Products / LED COBs, Engines, Modules, Strips / ams-OSRAM USA INC. / GW KAFFBB.GM-D3D4-40AB

ams-OSRAM USA INC. GW KAFFBB.GM-D3D4-40AB

OSRAM

Answer first: this page is a purchasing reference for the exact part number GW KAFFBB.GM-D3D4-40AB from ams-OSRAM USA INC.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: ams-OSRAM USA INC. Category: LED COBs, Engines, Modules, Strips Part number: GW KAFFBB.GM-D3D4-40AB Package: RFQ verification required

Key Parameters

Part NumberGW KAFFBB.GM-D3D4-40AB
Manufacturerams-OSRAM USA INC.
CategoryLED COBs, Engines, Modules, Strips
seriesSOLERIQ® S 9
packagingBulk
product statusObsolete
param 1Chip On Board (COB)
param 2White, Neutral
param 34000K
param 4-
param 5Square
param 61357lm (1261lm ~ 1452lm)
param 7300mA
param 825°C
param 935V
param 10129 lm/W
param 11690mA
param 1295
param 13110°
param 14-
param 1515.85mm L x 15.85mm W
param 161.65mm
param 178.90mm Dia
param 18Flat

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify GW KAFFBB.GM-D3D4-40AB Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For GW KAFFBB.GM-D3D4-40AB, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.