Aven Tools 26700-103-00
VIDEO INSPECT SYST CMOS 1X-71X
Answer first: this page is a purchasing reference for the exact part number 26700-103-00 from Aven Tools. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | 26700-103-00 |
|---|---|
| Manufacturer | Aven Tools |
| Category | Video Inspection Systems |
| series | VIS-6000 |
| packaging | Bulk |
| product status | Active |
| param 1 | CMOS 1/3" |
| param 2 | 1x ~ 71x |
| param 3 | 8.82" ~ 11.73" (224mm ~ 298mm) |
| param 4 | 5.00" ~ 48.00" (127mm ~ 1.22m) |
| param 5 | - |
| param 6 | 15" LCD |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify 26700-103-00 Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For 26700-103-00, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.