Home / Products / Central Semiconductor Corp / CMPSH-3AE TR PBFREE

Central Semiconductor Corp CMPSH-3AE TR PBFREE

DIODE ARR SCHOTT 40V 200MA SOT23

Answer first: this page is a purchasing reference for the exact part number CMPSH-3AE TR PBFREE from Central Semiconductor Corp. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Central Semiconductor Corp Part number: CMPSH-3AE TR PBFREE Package: TO-236-3, SC-59, SOT-23-3 RFQ verification required

Key Parameters

Part NumberCMPSH-3AE TR PBFREE
ManufacturerCentral Semiconductor Corp
CategoryDiode Arrays
packageTO-236-3, SC-59, SOT-23-3
series-
packagingTape & Reel (TR)
product statusActive
param 11 Pair Common Anode
param 2Schottky
param 340 V
param 4200mA
param 51 V @ 200 mA
param 6Small Signal =< 200mA (Io), Any Speed
param 75 ns
param 8500 nA @ 25 V
param 9-65°C ~ 150°C
param 10-
param 11-
param 12Surface Mount
param 13SOT-23

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify CMPSH-3AE TR PBFREE Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For CMPSH-3AE TR PBFREE, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.