Home / Products / Programmable Oscillators / EPSON / SG-9101CG-C20PHDBB

EPSON SG-9101CG-C20PHDBB

XTAL OSC PROG XO CMOS CTR SPRD

Answer first: this page is a purchasing reference for the exact part number SG-9101CG-C20PHDBB from EPSON. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: EPSON Category: Programmable Oscillators Part number: SG-9101CG-C20PHDBB Package: 4-SMD, No Lead RFQ verification required

Key Parameters

Part NumberSG-9101CG-C20PHDBB
ManufacturerEPSON
CategoryProgrammable Oscillators
package4-SMD, No Lead
seriesSG-9101
packagingTube
product statusActive
param 1Crystal
param 2XO (Standard)
param 3Programmed by Digi-Key (Enter your frequency in Web Order Notes)
param 4670 kHz ~ 170 MHz
param 5Enable/Disable
param 6CMOS
param 71.62V ~ 3.63V
param 8-
param 9-
param 10-40°C ~ 105°C
param 11±2.00%, Center Spread
param 12-
param 13-
param 14Surface Mount
param 15-
param 160.098" L x 0.079" W (2.50mm x 2.00mm)
param 170.031" (0.80mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify SG-9101CG-C20PHDBB Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For SG-9101CG-C20PHDBB, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.