KEMET ESD-R-19B
FERRITE CORE CLAMP 8.8MM
Answer first: this page is a purchasing reference for the exact part number ESD-R-19B from KEMET. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | ESD-R-19B |
|---|---|
| Manufacturer | KEMET |
| Category | Cable Ferrites |
| series | ESD-R-B |
| packaging | Bulk |
| product status | Active |
| param 1 | Round |
| param 2 | Clamp |
| param 3 | - |
| param 4 | MnZn |
| param 5 | 0.346" Dia (8.80mm) |
| param 6 | 0.846" Dia (21.50mm) |
| param 7 | - |
| param 8 | Chassis Mount |
| param 9 | 0.512" (13.00mm) |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify ESD-R-19B Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For ESD-R-19B, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.