Kycon, Inc. KLDX-SMT-0202-BP
SMT POWER JACK 2.50 MM DIA CNTR
Answer first: this page is a purchasing reference for the exact part number KLDX-SMT-0202-BP from Kycon, Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | KLDX-SMT-0202-BP |
|---|---|
| Manufacturer | Kycon, Inc. |
| Category | Power Connectors |
| series | KLDX-SMT |
| packaging | Tube |
| product status | Active |
| param 1 | Jack |
| param 2 | Male |
| param 3 | 2.50mm ID (0.098"), 5.50mm OD (0.217") |
| param 4 | 0.098" (2.50mm ID), 0.248" (6.30mm OD) |
| param 5 | 2 Conductors, 3 Contacts |
| param 6 | Single Switch, Normally Closed |
| param 7 | Surface Mount, Right Angle; Through Hole |
| param 8 | - |
| param 9 | Solder |
| param 10 | Unshielded |
| param 11 | Solder Retention |
| param 12 | - |
| param 13 | 24VDC |
| param 14 | 3.5 A |
| param 15 | - |
| param 16 | - |
| param 17 | UL94 V-0 |
| param 18 | -25°C ~ 85°C |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify KLDX-SMT-0202-BP Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For KLDX-SMT-0202-BP, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.