Home / Products / Coaxial Connector (RF) Assemblies / LEMO / PSA.1E.275.CLLC65

LEMO PSA.1E.275.CLLC65

CONN PNL MNT RCPT COAX SKT SLDER

Answer first: this page is a purchasing reference for the exact part number PSA.1E.275.CLLC65 from LEMO. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: LEMO Category: Coaxial Connector (RF) Assemblies Part number: PSA.1E.275.CLLC65 Package: RFQ verification required

Key Parameters

Part NumberPSA.1E.275.CLLC65
ManufacturerLEMO
CategoryCoaxial Connector (RF) Assemblies
series1E
packagingBulk
product statusActive
param 1Coaxial
param 2Receptacle, Female Socket
param 3Solder
param 4Clamp
param 575 Ohms
param 6Panel Mount
param 7Bulkhead - Rear Side Nut
param 8RG-58C, 59B, 179B, 187A, 223, 302, 400
param 9Push-Pull
param 10-
param 11-
param 12-
param 13Silver
param 14IP68 - Dust Tight, Waterproof
param 15Beryllium Copper

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify PSA.1E.275.CLLC65 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For PSA.1E.275.CLLC65, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.