Mill-Max Manufacturing Corp. 2707-2-00-80-00-00-07-0
TERM TURRET DBL
Answer first: this page is a purchasing reference for the exact part number 2707-2-00-80-00-00-07-0 from Mill-Max Manufacturing Corp.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | 2707-2-00-80-00-00-07-0 |
|---|---|
| Manufacturer | Mill-Max Manufacturing Corp. |
| Category | Turret Connectors |
| series | 2707 |
| packaging | Bulk |
| product status | Active |
| param 1 | Double End |
| param 2 | Single |
| param 3 | 0.156" (3.96mm) |
| param 4 | 0.219" (5.56mm) |
| param 5 | 0.375" (9.53mm) |
| param 6 | Through Hole |
| param 7 | Swage |
| param 8 | 0.156" (3.96mm) |
| param 9 | 0.070" (1.78mm) |
| param 10 | - |
| param 11 | - |
| param 12 | 0.120" (3.05mm) |
| param 13 | 0.062" (1.57mm) |
| param 14 | Brass Alloy |
| param 15 | Tin |
| param 16 | 200.0µin (5.08µm) |
| param 17 | Non-Insulated |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify 2707-2-00-80-00-00-07-0 Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For 2707-2-00-80-00-00-07-0, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.