Home / Products / RF Transceiver Modules and Modems / Multi-Tech Systems Inc. / MTXDOT-NA1-B15-TR-250

Multi-Tech Systems Inc. MTXDOT-NA1-B15-TR-250

XDOT ESSENTIAL WITH TRACE ANTENN

Answer first: this page is a purchasing reference for the exact part number MTXDOT-NA1-B15-TR-250 from Multi-Tech Systems Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Multi-Tech Systems Inc. Category: RF Transceiver Modules and Modems Part number: MTXDOT-NA1-B15-TR-250 Package: 58-SMD Module RFQ verification required

Key Parameters

Part NumberMTXDOT-NA1-B15-TR-250
ManufacturerMulti-Tech Systems Inc.
CategoryRF Transceiver Modules and Modems
package58-SMD Module
seriesxDot®
packagingTape & Reel (TR)
product statusActive
param 1-
param 2Cellular
param 3EDGE, LoRa™, LoRaWAN
param 4-
param 5915MHz
param 6-
param 721dBm
param 8-148dBm
param 9UART
param 10PCB Trace
param 11-
param 12384kB Flash, 160kB SRAM
param 132.4V ~ 3.57V
param 14-
param 15-
param 16Surface Mount
param 17-40°C ~ 85°C

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify MTXDOT-NA1-B15-TR-250 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For MTXDOT-NA1-B15-TR-250, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.