Home / Products / Ohmite / AF-C10-SD

Ohmite AF-C10-SD

PWR ENT RCPT IEC320-C14 PANEL QC

Answer first: this page is a purchasing reference for the exact part number AF-C10-SD from Ohmite. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Ohmite Part number: AF-C10-SD Package: RFQ verification required

Key Parameters

Part NumberAF-C10-SD
ManufacturerOhmite
CategoryPower Entry Modules (PEM)
seriesAF
packagingBulk
product statusObsolete
param 1IEC 320-C14
param 2Receptacle, Male Blades
param 310A
param 4250VAC
param 53
param 6Filtered (EMI, RFI) - Commercial
param 710A
param 8Switch On-Off
param 9-
param 10Yes (Fuse Not Included)
param 11Panel Mount, Flange
param 12Quick Connect - 0.250" (6.3mm)
param 13-
param 14Fuse Holder, Twin Fused
param 15-
param 16-
param 17UL94 V-0
param 18-
param 19cCSAus, CE, UR

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify AF-C10-SD Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For AF-C10-SD, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.