Omron Electronics Inc-EMC Div A7PS-206-PM-1
SWITCH THUMB SPDT 0.1A 50V
Answer first: this page is a purchasing reference for the exact part number A7PS-206-PM-1 from Omron Electronics Inc-EMC Div. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | A7PS-206-PM-1 |
|---|---|
| Manufacturer | Omron Electronics Inc-EMC Div |
| Category | Thumbwheel Switches |
| series | A7PS |
| packaging | Tray |
| product status | Active |
| param 1 | SPDT |
| param 2 | +/- |
| param 3 | 1 |
| param 4 | 0.268" (6.80mm) |
| param 5 | Pushwheel |
| param 6 | 0.1A @ 50VAC/28VDC |
| param 7 | - |
| param 8 | - |
| param 9 | Panel Mount, Snap-In |
| param 10 | Card Edge/Solder Pad |
| param 11 | Sold Separately |
| param 12 | 0.394" (10.00mm) |
| param 13 | - |
| param 14 | - |
| param 15 | -10°C ~ 65°C |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify A7PS-206-PM-1 Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For A7PS-206-PM-1, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.