Home / Products / 3M / 17-10-250

3M 17-10-250

CONN ADPT 0.25 TAB TO TERM

Answer first: this page is a purchasing reference for the exact part number 17-10-250 from 3M. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: 3M Part number: 17-10-250 Package: RFQ verification required

Key Parameters

Part Number17-10-250
Manufacturer3M
CategoryTerminal Adapters
series-
packagingBulk
product statusActive
param 10.25" (6.35mm) 1/4" Quick Connect, Male
param 2Ring Terminal
param 3Non-Insulated
param 4-
param 5Copper, ETP
param 6Tin
param 7-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify 17-10-250 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For 17-10-250, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.