Advantech Corp DPX-S425-00A1E
SBC 2.66GHZ 1 CORE 8GB/8MB RAM
Answer first: this page is a purchasing reference for the exact part number DPX-S425-00A1E from Advantech Corp. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | DPX-S425-00A1E |
|---|---|
| Manufacturer | Advantech Corp |
| Category | Single Board Computers (SBCs) |
| series | Gaming Platforms |
| packaging | Bulk |
| product status | Active |
| param 1 | Intel Core i7, i5/Celeron |
| param 2 | 2.66GHz |
| param 3 | 1 |
| param 4 | 38W |
| param 5 | Fan |
| param 6 | 7.870" x 6.690" (199.89mm x 169.92mm) |
| param 7 | - |
| param 8 | PCIe |
| param 9 | 8GB/8MB |
| param 10 | CompactFlash, SATA, SSD |
| param 11 | DVMT, H.264 |
| param 12 | GbE (2) |
| param 13 | USB 2.0 (12) |
| param 14 | 10 |
| param 15 | - |
| param 16 | - |
| param 17 | Yes |
| param 18 | Keyboard, Mouse |
| param 19 | 0°C ~ 50°C |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify DPX-S425-00A1E Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For DPX-S425-00A1E, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.