Home / Products / Multiple Conductor Cables / Alpha Wire / 5599/5C SL005

Alpha Wire 5599/5C SL005

CABLE 5CON 24AWG SLATE SHLD 100'

Answer first: this page is a purchasing reference for the exact part number 5599/5C SL005 from Alpha Wire. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Alpha Wire Category: Multiple Conductor Cables Part number: 5599/5C SL005 Package: RFQ verification required

Key Parameters

Part Number5599/5C SL005
ManufacturerAlpha Wire
CategoryMultiple Conductor Cables
seriesXtra-Guard® 1
packagingSpool
product statusActive
param 1Multi-Conductor
param 25
param 324 AWG
param 47/32
param 5Copper, Tinned
param 6Poly-Vinyl Chloride (PVC)
param 70.254" (6.45mm)
param 8Foil
param 9100.0' (30.5m)
param 10Slate
param 11UL Style 2343
param 12Drain Wire, Rip Cord
param 13300 V
param 14-30°C ~ 105°C
param 15-
param 160.0630" (1.600mm)
param 17Poly-Vinyl Chloride (PVC)
param 18-
param 19-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify 5599/5C SL005 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For 5599/5C SL005, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.