Home / Products / Uninterruptible Power Supply (UPS) Systems / Altech Corporation / CBI2420AP

Altech Corporation CBI2420AP

UPS POWER SOLUTION, 24VDC, 20A,

Answer first: this page is a purchasing reference for the exact part number CBI2420AP from Altech Corporation. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Altech Corporation Category: Uninterruptible Power Supply (UPS) Systems Part number: CBI2420AP Package: RFQ verification required

Key Parameters

Part NumberCBI2420AP
ManufacturerAltech Corporation
CategoryUninterruptible Power Supply (UPS) Systems
series-
packagingBulk
product statusActive
param 1-
param 2115VAC, 230VAC, 277VAC
param 3General Purpose, Industrial Control
param 4Din Rail
param 5500W
param 6-
param 7-
param 8RJ45
param 924V
param 10-
param 11-
param 12-
param 13-
param 145.315" L x 2.559" W (135.00mm x 65.00mm)
param 154.528" (115.00mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify CBI2420AP Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For CBI2420AP, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.