Home / Products / Analog Devices Inc./Maxim Integrated / LM4041BIM3-1.2-T

Analog Devices Inc./Maxim Integrated LM4041BIM3-1.2-T

IC VREF SHUNT 0.2% SOT23-3

Answer first: this page is a purchasing reference for the exact part number LM4041BIM3-1.2-T from Analog Devices Inc./Maxim Integrated. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Analog Devices Inc./Maxim Integrated Part number: LM4041BIM3-1.2-T Package: TO-236-3, SC-59, SOT-23-3 RFQ verification required

Key Parameters

Part NumberLM4041BIM3-1.2-T
ManufacturerAnalog Devices Inc./Maxim Integrated
CategoryVoltage Reference
packageTO-236-3, SC-59, SOT-23-3
series-
packagingTape & Reel (TR)
product statusObsolete
param 1Shunt
param 2Fixed
param 31.225V
param 4-
param 512 mA
param 6±0.2%
param 7100ppm/°C
param 8-
param 920µVrms
param 10-
param 11-
param 1260 µA
param 13-40°C ~ 85°C (TA)
param 14-
param 15-
param 16Surface Mount
param 17SOT-23-3

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify LM4041BIM3-1.2-T Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For LM4041BIM3-1.2-T, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.