Home / Products / Pliers / Apex Tool Group / NN7776VN

Apex Tool Group NN7776VN

PLIER 6 LONG NEEDLE NN777-6V

Answer first: this page is a purchasing reference for the exact part number NN7776VN from Apex Tool Group. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Apex Tool Group Category: Pliers Part number: NN7776VN Package: RFQ verification required

Key Parameters

Part NumberNN7776VN
ManufacturerApex Tool Group
CategoryPliers
seriesWeller® Xcelite®
packagingBulk
product statusActive
param 1Electronics
param 2Long Nose
param 3Straight
param 4Serrated
param 5Soft Grips
param 66.00" (152.4mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify NN7776VN Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For NN7776VN, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.