Home / Products / Digital to Analog Converters (DAC) / Asahi Kasei Microdevices/AKM / AK4376ECB

Asahi Kasei Microdevices/AKM AK4376ECB

IC DAC 32BIT V-OUT 36CSP

Answer first: this page is a purchasing reference for the exact part number AK4376ECB from Asahi Kasei Microdevices/AKM. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Asahi Kasei Microdevices/AKM Category: Digital to Analog Converters (DAC) Part number: AK4376ECB Package: 36-UFBGA, WLCSP RFQ verification required

Key Parameters

Part NumberAK4376ECB
ManufacturerAsahi Kasei Microdevices/AKM
CategoryDigital to Analog Converters (DAC)
package36-UFBGA, WLCSP
series-
packagingTape & Reel (TR)
product statusObsolete
param 1Not Verified
param 232
param 31
param 4-
param 5Voltage - Buffered
param 6No
param 7I2C
param 8-
param 91.7V ~ 1.9V
param 101.7V ~ 1.9V
param 11-
param 12-
param 13-40°C ~ 85°C
param 1436-CSP (2.56x2.74)
param 15Surface Mount
param 16-
param 17-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify AK4376ECB Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For AK4376ECB, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.