Home / Products / Panel Indicators, Pilot Lights / Banner Engineering Corporation / T8LGRXNQP

Banner Engineering Corporation T8LGRXNQP

T8 SERIES EZ-LIGHT: 2-COLOR GENE

Answer first: this page is a purchasing reference for the exact part number T8LGRXNQP from Banner Engineering Corporation. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Banner Engineering Corporation Category: Panel Indicators, Pilot Lights Part number: T8LGRXNQP Package: RFQ verification required

Key Parameters

Part NumberT8LGRXNQP
ManufacturerBanner Engineering Corporation
CategoryPanel Indicators, Pilot Lights
seriesEZ-LIGHT T8
packagingBox
product statusObsolete
param 1LED
param 2Green, Red
param 3-
param 4Diffused
param 5DC
param 610V ~ 30V
param 720mA
param 8Round
param 90.32" (8.00mm)
param 10-
param 11Round with Flat Top
param 12-
param 13-
param 14-
param 15Wire Leads - 78.74" (2m)
param 16IP67
param 17-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify T8LGRXNQP Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For T8LGRXNQP, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.