Home / Products / Bulgin / 14359

Bulgin 14359

CONN HEADER R/A 7POS 2.54MM

Answer first: this page is a purchasing reference for the exact part number 14359 from Bulgin. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Bulgin Part number: 14359 Package: RFQ verification required

Key Parameters

Part Number14359
ManufacturerBulgin
CategoryHeaders, Male Pins
seriesBuccaneer®
packagingBulk
product statusActive
param 1Header
param 2Male Pin
param 30.100" (2.54mm)
param 47
param 51
param 6-
param 7All
param 8Board to Cable/Wire
param 9Shrouded - 1 Wall
param 10Through Hole, Right Angle
param 11Solder
param 12Friction Lock
param 13-
param 14-
param 15-
param 160.250" (6.35mm)
param 17Square
param 18Gold
param 1930.0µin (0.76µm)
param 20Gold
param 21Copper Alloy
param 22-
param 23-
param 240°C ~ 70°C
param 25-
param 26UL94 V-0
param 27White
param 281A
param 29-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify 14359 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For 14359, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.