c3controls 1100-CB1C2D20
UL 489, 1 POLE, 2A, TRIP CURVE C
Answer first: this page is a purchasing reference for the exact part number 1100-CB1C2D20 from c3controls. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | 1100-CB1C2D20 |
|---|---|
| Manufacturer | c3controls |
| Category | Circuit Breakers |
| series | 1100 |
| packaging | Box |
| product status | Active |
| param 1 | DIN Rail |
| param 2 | Thermal Magnetic |
| param 3 | 2A |
| param 4 | 277 V |
| param 5 | 48 V |
| param 6 | Lever |
| param 7 | 1 |
| param 8 | None |
| param 9 | - |
| param 10 | CE, CSA C22.2 No. 5, cULus, UL489 |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify 1100-CB1C2D20 Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For 1100-CB1C2D20, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.