Home / Products / Power Relays, Over 2 Amps / c3controls / TBR-MF-6-1P-SC

c3controls TBR-MF-6-1P-SC

RELAY GEN PURP SPDT 6A 220-240V

Answer first: this page is a purchasing reference for the exact part number TBR-MF-6-1P-SC from c3controls. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: c3controls Category: Power Relays, Over 2 Amps Part number: TBR-MF-6-1P-SC Package: RFQ verification required

Key Parameters

Part NumberTBR-MF-6-1P-SC
Manufacturerc3controls
CategoryPower Relays, Over 2 Amps
seriesTBR
packagingBag
product statusActive
param 1DIN Rail
param 2220 ~ 240VAC/DC
param 3SPDT (1 Form C)
param 46 A
param 5250VAC, 30VDC - Max
param 6-
param 7-
param 8Non Latching
param 9-
param 10Screw Terminal
param 11-
param 12-
param 13-
param 14-
param 158 ms
param 164 ms
param 17-40°C ~ 55°C
param 18Silver Nickel (AgNi)
param 19-
param 20General Purpose
param 21-
param 22-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify TBR-MF-6-1P-SC Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For TBR-MF-6-1P-SC, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.