Home / Products / Pushbutton Switches / c3controls / W22DPB-ERFG-01/10

c3controls W22DPB-ERFG-01/10

22MM DPB EXTRD-B FLSHGN-T NCNO

Answer first: this page is a purchasing reference for the exact part number W22DPB-ERFG-01/10 from c3controls. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: c3controls Category: Pushbutton Switches Part number: W22DPB-ERFG-01/10 Package: RFQ verification required

Key Parameters

Part NumberW22DPB-ERFG-01/10
Manufacturerc3controls
CategoryPushbutton Switches
series22
packagingBag
product statusActive
param 1Panel Mount, Rear
param 2Standard
param 3DPST-NO/NC
param 4On-Mom, Off-Mom
param 510A (AC), 2.5A (DC)
param 672 V
param 728 V
param 8Round, Button, Dual
param 9No Marking
param 10Red, Green
param 11-
param 12-
param 13Screw Terminal
param 14IP66 - Dust Tight, Water Resistant
param 15-
param 16Circular - 22.50mm Dia
param 17-40°C ~ 55°C

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify W22DPB-ERFG-01/10 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For W22DPB-ERFG-01/10, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.