Home / Products / Carlo Gavazzi Inc. / SPDM481201

Carlo Gavazzi Inc. SPDM481201

AC/DC DIN RAIL SUPPLY 48V 120W

Answer first: this page is a purchasing reference for the exact part number SPDM481201 from Carlo Gavazzi Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Carlo Gavazzi Inc. Part number: SPDM481201 Package: RFQ verification required

Key Parameters

Part NumberSPDM481201
ManufacturerCarlo Gavazzi Inc.
CategoryIndustrial, DIN Rail Power Supplies
seriesSPDM (120W)
packagingBox
product statusActive
param 1AC or DC
param 21
param 390 ~ 264 VAC
param 4127V
param 5370V
param 648V
param 7-
param 8-
param 9-
param 10-
param 11-
param 122.5A
param 13120W
param 143 kV
param 15Industrial, ITE (Commercial)
param 1689%
param 17-20°C ~ 70°C (With Derating)
param 18Adjustable Output, IP20, Universal Input
param 194.68" L x 1.77" W x 4.88" H (119.0mm x 45.0mm x 124.0mm)
param 20CE, cULus, cURus
param 21-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify SPDM481201 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For SPDM481201, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.