Home / Products / Single Bipolar Transistors / Central Semiconductor Corp / 2N4424 PBFREE

Central Semiconductor Corp 2N4424 PBFREE

TRANS NPN 40V 0.5A TO-92-3

Answer first: this page is a purchasing reference for the exact part number 2N4424 PBFREE from Central Semiconductor Corp. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Central Semiconductor Corp Category: Single Bipolar Transistors Part number: 2N4424 PBFREE Package: TO-226-3, TO-92-3 (TO-226AA) RFQ verification required

Key Parameters

Part Number2N4424 PBFREE
ManufacturerCentral Semiconductor Corp
CategorySingle Bipolar Transistors
packageTO-226-3, TO-92-3 (TO-226AA)
series-
packagingBulk
product statusActive
param 1NPN
param 2500 mA
param 340 V
param 4300mV @ 3mA, 50mA
param 530nA
param 6180 @ 2mA, 4.5V
param 7625 mW
param 8-
param 9-65°C ~ 150°C (TJ)
param 10-
param 11-
param 12Through Hole
param 13TO-92-3

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify 2N4424 PBFREE Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For 2N4424 PBFREE, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.