Home / Products / Programmable Unijunction / Central Semiconductor Corp / 2N4949

Central Semiconductor Corp 2N4949

THROUGH-HOLE UJT

Answer first: this page is a purchasing reference for the exact part number 2N4949 from Central Semiconductor Corp. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Central Semiconductor Corp Category: Programmable Unijunction Part number: 2N4949 Package: TO-206AA, TO-18-3 Metal Can RFQ verification required

Key Parameters

Part Number2N4949
ManufacturerCentral Semiconductor Corp
CategoryProgrammable Unijunction
packageTO-206AA, TO-18-3 Metal Can
series-
packagingBox
product statusObsolete
param 1-
param 2-
param 33V
param 4-
param 5-
param 62 mA
param 71 µA

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify 2N4949 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For 2N4949, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.