Home / Products / Diode Arrays / Central Semiconductor Corp / BAW100 BK PBFREE

Central Semiconductor Corp BAW100 BK PBFREE

DIODE ARRAY GP 75V 250MA SOT-143

Answer first: this page is a purchasing reference for the exact part number BAW100 BK PBFREE from Central Semiconductor Corp. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Central Semiconductor Corp Category: Diode Arrays Part number: BAW100 BK PBFREE Package: TO-253-4, TO-253AA RFQ verification required

Key Parameters

Part NumberBAW100 BK PBFREE
ManufacturerCentral Semiconductor Corp
CategoryDiode Arrays
packageTO-253-4, TO-253AA
series-
packagingBulk
product statusObsolete
param 12 Independent
param 2Standard
param 375 V
param 4250mA (DC)
param 51.25 V @ 150 mA
param 6Fast Recovery =< 500ns, > 200mA (Io)
param 76 ns
param 81 µA @ 75 V
param 9-65°C ~ 150°C
param 10-
param 11-
param 12Surface Mount
param 13SOT-143

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify BAW100 BK PBFREE Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For BAW100 BK PBFREE, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.