Home / Products / Single Bipolar Transistors / Central Semiconductor Corp / BC856BT TR PBFREE

Central Semiconductor Corp BC856BT TR PBFREE

TRANS PNP 65V 0.1A SOT-523

Answer first: this page is a purchasing reference for the exact part number BC856BT TR PBFREE from Central Semiconductor Corp. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Central Semiconductor Corp Category: Single Bipolar Transistors Part number: BC856BT TR PBFREE Package: SC-89, SOT-490 RFQ verification required

Key Parameters

Part NumberBC856BT TR PBFREE
ManufacturerCentral Semiconductor Corp
CategorySingle Bipolar Transistors
packageSC-89, SOT-490
series-
packagingTape & Reel (TR)
product statusActive
param 1PNP
param 2100 mA
param 365 V
param 4400mV @ 5mA, 100mA
param 515nA (ICBO)
param 6220 @ 2mA, 5V
param 7250 mW
param 8100MHz
param 9-65°C ~ 150°C (TJ)
param 10-
param 11-
param 12Surface Mount
param 13SOT-523

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify BC856BT TR PBFREE Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For BC856BT TR PBFREE, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.