Home / Products / Bridge Rectifiers / Central Semiconductor Corp / CBRHD-02 TR13 PBFREE

Central Semiconductor Corp CBRHD-02 TR13 PBFREE

BRIDGE RECT 1P 200V 0.5A 4HD DIP

Answer first: this page is a purchasing reference for the exact part number CBRHD-02 TR13 PBFREE from Central Semiconductor Corp. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Central Semiconductor Corp Category: Bridge Rectifiers Part number: CBRHD-02 TR13 PBFREE Package: 4-SMD, Gull Wing RFQ verification required

Key Parameters

Part NumberCBRHD-02 TR13 PBFREE
ManufacturerCentral Semiconductor Corp
CategoryBridge Rectifiers
package4-SMD, Gull Wing
series-
packagingTape & Reel (TR)
product statusActive
param 1Single Phase
param 2Standard
param 3200 V
param 4500 mA
param 51 V @ 400 mA
param 65 µA @ 200 V
param 7-65°C ~ 150°C (TJ)
param 8-
param 9-
param 10Surface Mount
param 114-HD DIP

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify CBRHD-02 TR13 PBFREE Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For CBRHD-02 TR13 PBFREE, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.