Home / Products / Single Zener Diodes / Central Semiconductor Corp / CMDZ5L6 TR PBFREE

Central Semiconductor Corp CMDZ5L6 TR PBFREE

DIODE ZENER 5.6V 250MW SOD323

Answer first: this page is a purchasing reference for the exact part number CMDZ5L6 TR PBFREE from Central Semiconductor Corp. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Central Semiconductor Corp Category: Single Zener Diodes Part number: CMDZ5L6 TR PBFREE Package: SC-76, SOD-323 RFQ verification required

Key Parameters

Part NumberCMDZ5L6 TR PBFREE
ManufacturerCentral Semiconductor Corp
CategorySingle Zener Diodes
packageSC-76, SOD-323
series-
packagingTape & Reel (TR)
product statusActive
param 15.6 V
param 2±5%
param 3250 mW
param 4325 Ohms
param 51 µA @ 2 V
param 6900 mV @ 10 mA
param 7-65°C ~ 150°C
param 8-
param 9-
param 10Surface Mount
param 11SOD-323

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify CMDZ5L6 TR PBFREE Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For CMDZ5L6 TR PBFREE, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.