Home / Products / Single Bipolar Transistors / Central Semiconductor Corp / CMPTA96 TR PBFREE

Central Semiconductor Corp CMPTA96 TR PBFREE

TRANS PNP 450V 0.5A SOT-23

Answer first: this page is a purchasing reference for the exact part number CMPTA96 TR PBFREE from Central Semiconductor Corp. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Central Semiconductor Corp Category: Single Bipolar Transistors Part number: CMPTA96 TR PBFREE Package: TO-236-3, SC-59, SOT-23-3 RFQ verification required

Key Parameters

Part NumberCMPTA96 TR PBFREE
ManufacturerCentral Semiconductor Corp
CategorySingle Bipolar Transistors
packageTO-236-3, SC-59, SOT-23-3
series-
packagingTape & Reel (TR)
product statusActive
param 1PNP
param 2500 mA
param 3450 V
param 4500mV @ 5mA, 50mA
param 5100nA (ICBO)
param 650 @ 10mA, 10V
param 7350 mW
param 820MHz
param 9-65°C ~ 150°C (TJ)
param 10-
param 11-
param 12Surface Mount
param 13SOT-23

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify CMPTA96 TR PBFREE Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For CMPTA96 TR PBFREE, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.