Central Semiconductor Corp CSDD-25M BK
SCR 600V 25A D2PAK
Answer first: this page is a purchasing reference for the exact part number CSDD-25M BK from Central Semiconductor Corp. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | CSDD-25M BK |
|---|---|
| Manufacturer | Central Semiconductor Corp |
| Category | SCRs |
| package | TO-263-3, D2PAK (2 Leads + Tab), TO-263AB |
| series | - |
| packaging | Box |
| product status | Obsolete |
| param 1 | 600 V |
| param 2 | 1.5 V |
| param 3 | 30 mA |
| param 4 | 1.8 V |
| param 5 | 50 A |
| param 6 | 25 A |
| param 7 | 50 mA |
| param 8 | 10 µA |
| param 9 | 250A, 260A |
| param 10 | Standard Recovery |
| param 11 | -40°C ~ 125°C (TJ) |
| param 12 | - |
| param 13 | - |
| param 14 | Surface Mount |
| param 15 | D2PAK |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify CSDD-25M BK Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For CSDD-25M BK, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.