Home / Products / Single Diodes / Central Semiconductor Corp / CSICD05-1200 TR13

Central Semiconductor Corp CSICD05-1200 TR13

DIODE SIL CARBIDE 1.2KV 5A DPAK

Answer first: this page is a purchasing reference for the exact part number CSICD05-1200 TR13 from Central Semiconductor Corp. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Central Semiconductor Corp Category: Single Diodes Part number: CSICD05-1200 TR13 Package: TO-252-3, DPAK (2 Leads + Tab), SC-63 RFQ verification required

Key Parameters

Part NumberCSICD05-1200 TR13
ManufacturerCentral Semiconductor Corp
CategorySingle Diodes
packageTO-252-3, DPAK (2 Leads + Tab), SC-63
series-
packagingTape & Reel (TR)
product statusObsolete
param 1SiC (Silicon Carbide) Schottky
param 21200 V
param 35A
param 41.7 V @ 5 A
param 5No Recovery Time > 500mA (Io)
param 60 ns
param 7190 µA @ 1200 V
param 8240pF @ 1V, 1MHz
param 9-
param 10-
param 11Surface Mount
param 12DPAK
param 13-55°C ~ 175°C

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify CSICD05-1200 TR13 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For CSICD05-1200 TR13, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.