Central Technologies CTDAS0910AF-220M
SMD SHLD PWR INDUCTOR FOR DIG AM
Answer first: this page is a purchasing reference for the exact part number CTDAS0910AF-220M from Central Technologies. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | CTDAS0910AF-220M |
|---|---|
| Manufacturer | Central Technologies |
| Category | Fixed Inductors |
| package | Horizontal, 4 PC Pad |
| series | CTDAS0910AF |
| packaging | Tape & Reel (TR) |
| product status | Active |
| param 1 | - |
| param 2 | - |
| param 3 | 22 µH |
| param 4 | ±20% |
| param 5 | 3.5 A |
| param 6 | 3.3A |
| param 7 | Shielded |
| param 8 | 45mOhm Max |
| param 9 | - |
| param 10 | - |
| param 11 | - |
| param 12 | -55°C ~ 125°C |
| param 13 | 1 kHz |
| param 14 | - |
| param 15 | Surface Mount |
| param 16 | Horizontal, 4 PC Pad |
| param 17 | 0.394" L x 0.354" W (10.00mm x 9.00mm) |
| param 18 | 0.413" (10.50mm) |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify CTDAS0910AF-220M Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For CTDAS0910AF-220M, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.