Home / Products / Fixed Inductors / Central Technologies / CTMMP8751F-2R2M

Central Technologies CTMMP8751F-2R2M

SMD Shielded Power Inductor

Answer first: this page is a purchasing reference for the exact part number CTMMP8751F-2R2M from Central Technologies. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Central Technologies Category: Fixed Inductors Part number: CTMMP8751F-2R2M Package: - RFQ verification required

Key Parameters

Part NumberCTMMP8751F-2R2M
ManufacturerCentral Technologies
CategoryFixed Inductors
package-
series-
packagingBulk
product statusActive
param 1-
param 2-
param 32.2 µH
param 4±20%
param 548 A
param 6-
param 7Shielded
param 81.25mOhm
param 9-
param 10-
param 11-
param 12-40°C ~ 125°C
param 13-
param 14-
param 15Surface Mount
param 16-
param 170.886" L x 0.866" W (22.50mm x 22.00mm)
param 180.512" (13.00mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify CTMMP8751F-2R2M Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For CTMMP8751F-2R2M, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.