Home / Products / Coaxial Connector (RF) Assemblies / Cinch Connectivity Solutions Trompeter / CBBJR79

Cinch Connectivity Solutions Trompeter CBBJR79

CONN TRB JACK R/A PCB

Answer first: this page is a purchasing reference for the exact part number CBBJR79 from Cinch Connectivity Solutions Trompeter. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Cinch Connectivity Solutions Trompeter Category: Coaxial Connector (RF) Assemblies Part number: CBBJR79 Package: RFQ verification required

Key Parameters

Part NumberCBBJR79
ManufacturerCinch Connectivity Solutions Trompeter
CategoryCoaxial Connector (RF) Assemblies
series70
packagingBulk
product statusActive
param 1TRB, Twinaxial/Triaxial
param 2Jack, Female Socket (Concentric)
param 3Solder
param 4Solder
param 5Non-Constant
param 6Panel Mount, Through Hole, Right Angle
param 7Bulkhead - Front Side Nut
param 8-
param 9Bayonet Lock
param 10500 MHz
param 111
param 12Three Lug
param 13Silver
param 14-
param 15Beryllium Copper

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify CBBJR79 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For CBBJR79, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.