Home / Products / Application Specific Clock/Timing / Connor Winfield / CW25-GDO-DK1-010.0.M

Connor Winfield CW25-GDO-DK1-010.0.M

IC GPS BASED TIMING MOD (TCXO)

Answer first: this page is a purchasing reference for the exact part number CW25-GDO-DK1-010.0.M from Connor Winfield. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Connor Winfield Category: Application Specific Clock/Timing Part number: CW25-GDO-DK1-010.0.M Package: 42-SMD Module RFQ verification required

Key Parameters

Part NumberCW25-GDO-DK1-010.0.M
ManufacturerConnor Winfield
CategoryApplication Specific Clock/Timing
package42-SMD Module
seriesCW25-GDO-DK
packagingStrip
product statusActive
param 1Not Verified
param 2Yes
param 3GPS
param 4LVCMOS
param 5CMOS, LVDS, LVPECL
param 61
param 72:3
param 8No/No
param 9700MHz
param 102.97V ~ 3.63V
param 11-20°C ~ 70°C
param 12Surface Mount
param 13-
param 14-
param 1542-SMD Module

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify CW25-GDO-DK1-010.0.M Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For CW25-GDO-DK1-010.0.M, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.