Cornell Dubilier Knowles MC22FF501F-TF
CAP MICA 500PF 1% 1KV 2220
Answer first: this page is a purchasing reference for the exact part number MC22FF501F-TF from Cornell Dubilier Knowles. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | MC22FF501F-TF |
|---|---|
| Manufacturer | Cornell Dubilier Knowles |
| Category | Mica and PTFE Capacitors |
| package | 2220 (5750 Metric) |
| series | MC |
| packaging | Tape & Reel (TR) |
| product status | Active |
| param 1 | 500 pF |
| param 2 | ±1% |
| param 3 | 1 kV |
| param 4 | Mica |
| param 5 | -55°C ~ 125°C |
| param 6 | Surface Mount |
| param 7 | - |
| param 8 | RF, High Q, Low Loss |
| param 9 | 0.224" L x 0.197" W (5.70mm x 5.00mm) |
| param 10 | 0.157" (4.00mm) |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify MC22FF501F-TF Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For MC22FF501F-TF, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.