Home / Products / Mica and PTFE Capacitors / Cornell Dubilier Knowles / MCN12CD010D

Cornell Dubilier Knowles MCN12CD010D

CAP MICA 1PF 0.5PF 500V 1210

Answer first: this page is a purchasing reference for the exact part number MCN12CD010D from Cornell Dubilier Knowles. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Cornell Dubilier Knowles Category: Mica and PTFE Capacitors Part number: MCN12CD010D Package: 1210 (3225 Metric) RFQ verification required

Key Parameters

Part NumberMCN12CD010D
ManufacturerCornell Dubilier Knowles
CategoryMica and PTFE Capacitors
package1210 (3225 Metric)
seriesMCN
packagingBulk
product statusLast Time Buy
param 11 pF
param 2±0.5pF
param 3500 V
param 4Mica
param 5-55°C ~ 125°C
param 6Surface Mount
param 7-
param 8RF, High Q, Low Loss
param 90.126" L x 0.098" W (3.20mm x 2.50mm)
param 100.079" (2.00mm)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify MCN12CD010D Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For MCN12CD010D, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.