Home / Products / AC Fans / ebm-papst Inc. / R2E140-AE77-05

ebm-papst Inc. R2E140-AE77-05

MOTORIZED IMPELLER

Answer first: this page is a purchasing reference for the exact part number R2E140-AE77-05 from ebm-papst Inc.. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: ebm-papst Inc. Category: AC Fans Part number: R2E140-AE77-05 Package: RFQ verification required

Key Parameters

Part NumberR2E140-AE77-05
Manufacturerebm-papst Inc.
CategoryAC Fans
seriesR2E140
packagingBulk
product statusActive
param 1230VAC
param 2Round - 140mm Dia
param 372.00mm
param 4-
param 50.201 in H2O (50.0 Pa)
param 6Ball
param 7Motorized Impellers
param 8Capacitor, Thermal Overload Protector (TOP)
param 9-
param 10115W
param 111500 RPM
param 124 Wire Leads with Splice Terminals
param 13IP44
param 14-13 ~ 95°F (-25 ~ 35°C)
param 15CCC, CE, EAC
param 162.4 lbs (1.1 kg)

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify R2E140-AE77-05 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For R2E140-AE77-05, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.