Eclipse Tools 902-201
RG58, 59, 62, LMR-240
Answer first: this page is a purchasing reference for the exact part number 902-201 from Eclipse Tools. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.
Key Parameters
| Part Number | 902-201 |
|---|---|
| Manufacturer | Eclipse Tools |
| Category | Crimp Heads, Die Sets |
| series | - |
| packaging | Retail Package |
| product status | Active |
| param 1 | Die Set |
| param 2 | Coaxial, RF - BNC, F, TNC |
| param 3 | Hex - 0.052", 0.068", 0.100", 0.213", 0.255" |
| param 4 | 300-054, 300-096, 902-085 |
| param 5 | RG-58, 59, 62, LMR 240 |
Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.
How to Verify 902-201 Before Ordering
Datasheet and parameter checks
- Confirm the full manufacturer part number, not only a shortened search keyword.
- Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
- Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.
RFQ fields SENICO needs
- Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
- State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
- Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.
For 902-201, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.
We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.
Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.