Home / Products / Personal Protective Equipment (PPE) / Eclipse Tools / 902-621

Eclipse Tools 902-621

Nitrile Gloves - L

Answer first: this page is a purchasing reference for the exact part number 902-621 from Eclipse Tools. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Eclipse Tools Category: Personal Protective Equipment (PPE) Part number: 902-621 Package: RFQ verification required

Key Parameters

Part Number902-621
ManufacturerEclipse Tools
CategoryPersonal Protective Equipment (PPE)
series-
packagingRetail Package
product statusActive
param 1Gloves
param 2Red
param 3Large

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify 902-621 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For 902-621, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.