Home / Products / EOS Power / LFMWLP225-1304

EOS Power LFMWLP225-1304

AC/DC CONVERTER 48V 120W

Answer first: this page is a purchasing reference for the exact part number LFMWLP225-1304 from EOS Power. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: EOS Power Part number: LFMWLP225-1304 Package: RFQ verification required

Key Parameters

Part NumberLFMWLP225-1304
ManufacturerEOS Power
CategoryAC DC Converters
seriesMWLP225 (225W)
packagingBulk
product statusActive
param 1Open Frame
param 21
param 385 ~ 264 VAC, 390VDC
param 448V
param 5-
param 6-
param 7-
param 8-
param 9-
param 102.5 A
param 11-
param 12-
param 13-
param 14-
param 15-
param 16120W (225W Forced Air)
param 17Medical
param 184 kV
param 1994%
param 20-40°C ~ 70°C (With Derating)
param 21Adjustable Output, PFC, Standby Output, Universal Input
param 22Chassis Mount
param 234.00" L x 2.00" W x 1.00" H (101.6mm x 50.8mm x 25.4mm)
param 24CB, CE, cUL, NEMKO, UL
param 25-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify LFMWLP225-1304 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For LFMWLP225-1304, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.