Home / Products / ERP Power, LLC / EBR015U-0350-42

ERP Power, LLC EBR015U-0350-42

LED DRIVER CC AC/DC 30-42V 350MA

Answer first: this page is a purchasing reference for the exact part number EBR015U-0350-42 from ERP Power, LLC. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: ERP Power, LLC Part number: EBR015U-0350-42 Package: RFQ verification required

Key Parameters

Part NumberEBR015U-0350-42
ManufacturerERP Power, LLC
CategoryLED Drivers
seriesEBR (15W)
packagingBox
product statusActive
param 1Not Verified
param 2Constant Current
param 3AC DC Converter
param 41
param 590VAC
param 6132VAC
param 730 ~ 42V
param 8350mA
param 915 W
param 10-
param 11ELV, Triac
param 12OCP, OTP, SCP
param 13IP20
param 14-30°C ~ 90°C
param 1587%
param 16Wire Leads
param 172.28" Dia x 1.25" H (57.9mm x 31.8mm)
param 18CE, cURus
param 19-

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify EBR015U-0350-42 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For EBR015U-0350-42, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.