Home / Products / Circuit Board Indicators, Arrays, Light Bars, Bar Graphs / Everlight Electronics Co Ltd / A1844B/4SYG/S530-E2

Everlight Electronics Co Ltd A1844B/4SYG/S530-E2

LED CBI 3MM QUAD GRN/YELLOW RA

Answer first: this page is a purchasing reference for the exact part number A1844B/4SYG/S530-E2 from Everlight Electronics Co Ltd. Use it to start datasheet, package, manufacturer and RFQ verification; do not treat page text as a live stock, price or lead-time promise.

Manufacturer: Everlight Electronics Co Ltd Category: Circuit Board Indicators, Arrays, Light Bars, Bar Graphs Part number: A1844B/4SYG/S530-E2 Package: RFQ verification required

Key Parameters

Part NumberA1844B/4SYG/S530-E2
ManufacturerEverlight Electronics Co Ltd
CategoryCircuit Board Indicators, Arrays, Light Bars, Bar Graphs
series-
packaging-
product statusActive
param 1Green (x 2), Yellow (x 2)
param 2575nm
param 34 High
param 420mA
param 550mcd
param 660°
param 7Diffused, Tinted
param 8Round with Domed Top
param 93mm, T-1
param 102V
param 11Through Hole, Right Angle

Parameters are provided for purchasing review. Confirm package, suffix, lifecycle status, datasheet revision and approved substitutes before ordering.

How to Verify A1844B/4SYG/S530-E2 Before Ordering

Datasheet and parameter checks

  • Confirm the full manufacturer part number, not only a shortened search keyword.
  • Compare package, pinout, dimensions, voltage or rating fields, temperature range and compliance wording against the released BOM.
  • Use the manufacturer datasheet or drawing for electrical and mechanical limits before approving a substitute.

RFQ fields SENICO needs

  • Send exact part number, manufacturer, quantity, target delivery date, destination and required packaging.
  • State whether alternates are allowed, and list any date-code, certificate, traceability or customer AVL requirement.
  • Keep exact stock, factory lead time and proposed alternatives in separate quote lanes.

For A1844B/4SYG/S530-E2, SENICO recommends checking manufacturer marking, package, date code, requested quantity, approved vendor requirements and replacement risk before issuing a purchase order. If a supplier suggests an equivalent, record the changed fields and approval owner before comparing price.

We do not treat displayed data as a real-time stock or price commitment. The RFQ reply is the verified commercial reference.

Related buying guides: stock and lead-time verification, equivalent IC comparison, and BOM RFQ preparation.